Muscogee County School District · Columbus, GeorgiaGeorgia Standards of Excellence · Grade 6 Studio Pilot

Build & test your levee

You're the Design Lead · Career lens: Civil Engineer

Build a levee, flood test it, and use your own measurements and results to decide what needs to change.

Measure

Use accurate dimensions.

Test

See how the levee performs.

Explain

Use evidence to back your decision.

42:18left in class
The scenario

Riverside Bend, a neighborhood on the Chattahoochee

Riverside Bend is a made-up neighborhood of about 400 homes sitting on the inside curve of the Chattahoochee River in Columbus, Georgia. The land there is low — most of it sits about 2.4 meters above normal river level — and a single road, Bend Road, connects it to the elementary school and the clinic on higher ground.

Two springs ago the river rose past 2.8 meters and water reached the first row of houses. The city water utility put the job out for bids before the next high-water season, and your team is the small engineering firm they hired to solve it. You have a $1.2 million budget, a strip of public greenway along the bank to build on, and a rule that Bend Road must stay open during a flood. At the end you present your design to the city and say why it is worth the money.

Who hired you

The city water utility hired your team as the engineering firm on the Riverside Bend job.

What is at stake

About 400 homes, the only road out, and the money the city can actually spend.

What you must decide

How high and how wide to build, and who is protected first if you can't protect everyone.

River level, normal
0.0 m baseline
Highest recent crest
2.87 m
Neighborhood elevation
2.4 m above baseline
Build budget
$1.2 million

Riverside Bend is a practice setting built for this demonstration. The river, the flood heights, and the kind of decision are real to Columbus, Georgia; the neighborhood name and the budget are not.

Tabletop scale model of a community levee under test
Off the screen Our build · Team Delta

Our build

  1. 01CutTwo 30 cm × 4 cm foam strips for the wall.
  2. 02PlaceSet them along the river bend on your model.
  3. 03Pour500 mL upstream. Time how long it holds.
  4. 04RecordThree observations. One photo before, one after.
Turn it in

2 of 4 pieces of evidence ready

Standards today: MGSE6.G.2 · S6E5.c · ELAGSE6W1

View my portfolio