
Photo taken by Olivia · Oct 14, 2:41 PM · phone upload

Not student work. Shown so students can see what the finished build can look like.
Design a Resilient Community
Levee model, flood pan setup, team test log (Team Delta, 4 students)
- · Levee scale calculation at 1:50 — then 4,320 cm³ of foam, worked by hand
- · 150-word watershed note with 2 cited sources
- · Before/after flood photo + caption (this photo)
- · AI verification: rejected the model's slope advice after our pan test
My reflection"I used to think engineers just built things. Now I get that they choose who gets protected first. My team put the levee on the low-income side, so we had to redo it."
Teacher feedbackOlivia's revision after the equity discussion was the strongest work in the class. Her scale math was exact.




